1991 Falcon 50
$2,195,000
SN: 224 · REG: N312WM
CONTACT
Gary Ernst
Gary@scross.com
HIGHLIGHTS
-1C/5C accomplished in July 2022, 2C not due until July 2028
-Landing Gear Overhaul not due until MAR 2028
-Dual UNS-1Fw GPS/FMS WAAS/LPV
-Good Cosmetics
-MSP Gold
AIRFRAME
ACTT: 8,861
Cycles: 5,680
ENGINES
Honeywell MSP-Gold
TFE731-3-1C
CZI = 4200 hrs
MPI = 1400 hrs
Engine #1
TSN: 8,529.9
CSN: 5,647
Hrs until MPI: 482.2
Hrs until CZI: 2,007.5
Engine #2
TSN: 8,705.6
CSN: 5,555
Hrs until MPI: 788.0
Hrs until CZI: 3,688.0
Engine #3
TSN: 8,687.9
CSN: 5,559
Hrs until MPI: 673.8
Hrs until CZI: 2,378.8
APU
GTCP36-100(A)
1,368.1 hrs until HSI
Total Time: 5,040
AVIONICS
Dual UNS-1Fw GPS/FMS (1000.8)
Collins Dual VHF-22C w/ 8.33 Spacing
Collins WXT-250A Weather Radar
Collins Dual VIR-32 Navs w/ FM Immunity
Collins TTR-920 TCAS II (MOPS 7.0)
Collins Dual ADF-60A
Honeywell Mark V EGPWS
Collins Dual DME-42
Collins EFD-86 Five Screen EFIS
Collins Dual RTUs
Collins Dual ALT-55B Radio Altimeter
Fairchild A100A CVR
Honeywell Triple Laseref II IRS
Bendix King Dual KTR-953 HF Radios
Collins FCC-86D Flight Control System
Artex ELT C406-1 406MHz
Collins Dual TDR-94D Enhanced Mode S Transponders w/ ADS-B Out
ADDITIONAL EQUIPMENT
Honeywell AFIS DMU
Dual Davtron M811B Clocks
Teledyne Angle of Attack Indication System
Collins Airshow 400
RVSM SB F50-246 Compliant
Concorde RG390E/LS Lead Acid Main Batteries
CAMP Maintenance Tracking Enrolled
Aircell ST3100 Radio/Satellite Telephone
Honeywell N1 DEECs
Wing Fuel Tank Dry Bay Mod AD & SB C/W 3/7/16
INTERIOR
Refurbished December 8, 2006
9 Passenger Cabin Configuration & Jumpseat
Aft Lavatory and Fwd Galley
Tia WaveJet Microwave & Hot Liquid Container
110V Cabin Outlets
DVD/CD/AUX Cabin Entertainment w/ Fwd Cabin Monitor
Cabin LED Lighting
EXTERIOR
White with Orange & Gray Stripes, painted 03/07/2016
LED Taxi, Landing, Nav & Rear Strobe
INSPECTIONS
1Bdue in 1450 hrs | 12M dueJuly 2024
2B & 4B due in 1597 hrs | 24M due May/June 2022
3B due in 3097 hrs | 36M due July 2025
1C/5C accomplished in July 2022, 2C due July 2028
MLG, NLG & Drag Brace Overhaul due MAR 2028
LOOKING FOR MORE INFO?
Please submit a request below and
we’ll be in touch right away.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
JOIN OUR MAILING LIST AND NEVER MISS AN OPPORTUNITY