1991 Falcon 50
$2,195,000
SN: 224 · REG: N312WM
CONTATO
Gary Ernst
Gary@scross.com
HIGHLIGHTS
-1C/5C accomplished in July 2022, 2C not due until July 2028
-Landing Gear Overhaul not due until MAR 2028
-Dual UNS-1Fw GPS/FMS WAAS/LPV
-Good Cosmetics
-MSP Gold
AIRFRAME
ACTT: 8,861
Cycles: 5,680
ENGINES
Honeywell MSP-Gold
TFE731-3-1C
CZI = 4200 hrs
MPI = 1400 hrs
Engine #1
TSN: 8,529.9
CSN: 5,647
Hrs until MPI: 482.2
Hrs until CZI: 2,007.5
Engine #2
TSN: 8,705.6
CSN: 5,555
Hrs until MPI: 788.0
Hrs until CZI: 3,688.0
Engine #3
TSN: 8,687.9
CSN: 5,559
Hrs until MPI: 673.8
Hrs until CZI: 2,378.8
APU
GTCP36-100(A)
1,368.1 hrs until HSI
Total Time: 5,040
AVIONICS
Dual UNS-1Fw GPS/FMS (1000.8)
Collins Dual VHF-22C w/ 8.33 Spacing
Collins WXT-250A Weather Radar
Collins Dual VIR-32 Navs w/ FM Immunity
Collins TTR-920 TCAS II (MOPS 7.0)
Collins Dual ADF-60A
Honeywell Mark V EGPWS
Collins Dual DME-42
Collins EFD-86 Five Screen EFIS
Collins Dual RTUs
Collins Dual ALT-55B Radio Altimeter
Fairchild A100A CVR
Honeywell Triple Laseref II IRS
Bendix King Dual KTR-953 HF Radios
Collins FCC-86D Flight Control System
Artex ELT C406-1 406MHz
Collins Dual TDR-94D Enhanced Mode S Transponders w/ ADS-B Out
ADDITIONAL EQUIPMENT
Honeywell AFIS DMU
Dual Davtron M811B Clocks
Teledyne Angle of Attack Indication System
Collins Airshow 400
RVSM SB F50-246 Compliant
Concorde RG390E/LS Lead Acid Main Batteries
CAMP Maintenance Tracking Enrolled
Aircell ST3100 Radio/Satellite Telephone
Honeywell N1 DEECs
Wing Fuel Tank Dry Bay Mod AD & SB C/W 3/7/16
INTERIOR
Refurbished December 8, 2006
9 Passenger Cabin Configuration & Jumpseat
Aft Lavatory and Fwd Galley
Tia WaveJet Microwave & Hot Liquid Container
110V Cabin Outlets
DVD/CD/AUX Cabin Entertainment w/ Fwd Cabin Monitor
Cabin LED Lighting
EXTERIOR
White with Orange & Gray Stripes, painted 03/07/2016
LED Taxi, Landing, Nav & Rear Strobe
INSPECTIONS
1Bdue in 1450 hrs | 12M dueJuly 2024
2B & 4B due in 1597 hrs | 24M due May/June 2022
3B due in 3097 hrs | 36M due July 2025
1C/5C accomplished in July 2022, 2C due July 2028
MLG, NLG & Drag Brace Overhaul due MAR 2028
LOOKING FOR MORE INFO?
Please submit a request below and
we’ll be in touch right away.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
JUNTE-SE À NOSSA LISTA DE E-MAILS E NUNCA PERCA UMA OPORTUNIDADE